Back
Coricancha Mine Complex ASSET
ASSET DESCRIPTION
ASSET DESCRIPTION
Overview
Contained Material
Operations
Fleet
Energy
Economics
Access to Property
ASSET NAME
Coricancha Mine Complex
ASSET TYPE
Development
Development METALS & MINERALS
Copper, Gold, Lead, Silver
DEPOSIT TYPE
Massive sulphide veins and replacement bodies formed at epithermal to mesothermal conditions.
SPECIFIC LOCATION
La Oroya, Junin, Peru
HISTORICAL OWNERSHIP
OWNERSHIPFROMTOCOMMENT
MINERAL RESOURCES AND RESERVES
Mineral Resources:
MetalMeasuredIndicatedInferredAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffTonnageGradeContainedContained
Copper 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0
Gold 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0
Lead 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0
Silver 0 k mt 0 g/t 0 m oz 0 g/t 0 k mt 0 g/t 0 m oz 0 g/t 0 k mt 0 g/t 0 m oz 0
Mineral Reserves:
MetalProvenProbableAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffContained
Copper 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0 % 0
Gold 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0 g/t 0
Lead 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0 % 0
Silver 0 k mt 0 g/t 0 m oz 0 g/t 0 k mt 0 g/t 0 m oz 0 g/t 0
TOTAL CASH COST PER GOLD OUNCE
Amount in millionsMiningProcessingAdminRoyaltiesTotal%
Fuel000000 %
Maintenance000000 %
Labour000000 %
Insurance000000 %
Royalities000000 %
Reagents000000 %
Explosives000000 %
Contractors/consultants000000 %
Other*000000 %
Total US$ millions000000 %
PRODUCTION
PRODUCTION CYCLE Annual 2026 Experiences Expectations
2025 Q1 Q2 Q3 Q4 2026 5 Year Avg Remaining LOM
00000000Capital Expenditures13
00000000Ore Tons Mined23
00000000Mill Feed - Ore Tons Processed33
00000000Copper (m lbs) Produced762
00000000Gold (k oz) Produced792
00000000Lead (m lbs) Produced822
00000000Silver (m oz) Produced932
00000000Copper (m lbs) Sold761
00000000Gold (k oz) Sold791
00000000Lead (m lbs) Sold821
00000000Silver (m oz) Sold931
00000000Copper Recovery (%)764
00000000Gold Recovery (%)794
00000000Lead Recovery (%)824
00000000Silver Recovery (%)934
00000000Cash Operating Cost43
00000000All - in Sustaining Costs53
00000000Strip Ratio – Waste:Ore63
ARTICULATED HAULERS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
MINING TRUCKS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
POWER DEMAND
ENERGY SOURCEENERGY TYPEAVAILABLE POWER (MW)US$ PER KWHCONTRACT #EXPIRATION DATE
POWER AND ENGINEERING
Power Usage: total MWh per year
Peak power demand MW
Environmental Impact Assessment, man hours
Engineering firms
Local firms
AFTER TAX & ROYALTY NET PRESENT VALUE
Initial Capital Cost Operating Expenses NVP Discount RatePayback periodAfter tax IRRCopper (lbs)Gold (oz)Lead (lbs)Silver (oz)
Date of Assessment
Jun 5, 2026